Jewelry Sample Approval Checklist Before Production

Diagram of identifying the sample revision, reviewing details and recording the approval decision

A jewelry sample is useful only when everyone knows which version is being reviewed. Before approving production, match the sample to the latest drawing, quotation and written requirements. A positive comment on a photograph should not be mistaken for approval of every detail.

Identify the revision, review details and record the decision / Identificar la versión, revisar los detalles y registrar la decisión

1. Identify the sample

Record the product reference, sample version, date received, material and finish specified, and the drawing revision. Photograph the sample from consistent angles. If you have several colours or sizes, identify which variants were physically reviewed and which remain unreviewed.

2. Check against agreed requirements

Review area What to record
Dimensions and fit Agreed measurements, observed measurements and any difference requiring clarification
Material and finish Quoted specification, appearance and supporting documents requested; appearance alone does not establish material composition
Stones and decoration Placement, colour reference, orientation and any visible discrepancy
Closures and connections How the sample opens, closes and moves during the agreed review
Logo and markings Spelling, position, size and approved artwork version
Packaging Packaging version, labels, quantity per pack and protection requirements

Agree acceptance criteria with the manufacturer before judging a difference. This checklist does not prescribe universal tolerances or replace testing required for your market. A visual review cannot prove composition, long-term durability or regulatory compliance.

3. Separate approval from open questions

Choose a clear status: approved, revision required, or decision pending. List every requested change individually. If only part of the sample is approved, name that part and state what still needs confirmation. Ask whether a revised physical sample or another review is needed; do not assume a changed drawing automatically changes the production specification.

Illustrative example: a partial approval

A buyer reviewing a pair of earrings is satisfied with the outline and colour, but the logo on the back differs from the approved artwork. A short reply such as “looks good” would leave the production decision unclear.

Sample version A: outline and colour approved against the attached reference photographs. Logo: revision required to match artwork version B. Overall decision: production approval pending the logo revision. Please confirm which revised version we should review before giving final approval.

Attach a marked photograph and the artwork version to the same note. Keep each approved detail separate from the requested change, and record the final decision when the revised version has been reviewed.

4. Keep a revision log

Copy these fields into your order file:

  • Product and sample version:
  • Drawing and quotation references:
  • Reviewed by / date:
  • Item checked / observation:
  • Requested change / supporting photo:
  • Manufacturer response:
  • Revised version to review:
  • Final decision / approved specification:
  • Items still awaiting confirmation:

Keep the written decision with the agreed specification and order documents. Confirm the production schedule after unresolved changes have been addressed. Retain the reference sample where practical so later discussions refer to the same object.

For the information to prepare before sampling, read our jewelry manufacturer RFQ checklist. To discuss a sample brief, email [email protected].

Browse buying resources

Table of Contents

Share:

Send Us A Message

More Posts

Get in touch

Fill out the form below, and we will be in touch shortly.